Monday, March 28, 2016

Basement Progress

We have partially finished the basement bath, just in time for March Madness. We knew we would be having friends over to watch the games, and to cheer on our Cyclones, so we wanted to have at least a stool installed. First we had to get some tile down. I selected a favorite tile that I use often at work, and hired our installer. 


We had the tile installed on a Saturday, and the stool and vanity cabinet installed on Wednesday. 




Just in time. We modified the basement so that the guys could watch 3-4 games at the same time. 


With the Cyclones bowing out in the Sweet 16, we mostly have our basement put back together. We are going to keep working on the bath, slowly but surely. Next up, vanity light fixture and mirror. Hopefully the built in storage unit and tile shower aren't too far behind. 